Johannesburg to Cape Town in an Electric Car: Every Verified Charging Stop
By EV Cost Calculator Team · Published · Last updated
You can drive an electric car from Johannesburg to Cape Town. The record for the route is 19 hours. But the N1 is the harder of South Africa's two big corridors, the charging is concentrated in a handful of single sites, and you should not attempt it without a plan and a backup.
This guide lists only charging sites we could verify from a named source. Where popular route planners list stops we could not confirm, we say so rather than repeat them. The honest version is more useful than a confident one.
The route and the distances
The N1 runs roughly 1,397 km from Johannesburg to Cape Town, according to Kweli, which measures the corridor for freight operators. Useful cumulative distances from Johannesburg on that route:
| Point | Distance from Johannesburg |
|---|---|
| Colesberg | 592 km |
| Beaufort West | 912 km |
| Touws River | 1,206 km |
| Cape Town | 1,397 km |
The stretch that defines the trip is Colesberg to Beaufort West, which is 320 km with one verified DC charging site in between, at Richmond.
Verified DC charging sites on the N1
Listed north to south. Every entry has a named source.
| Town | Site | Operator | DC power |
|---|---|---|---|
| Ventersburg | Caltex Star Stop Sulla Via | Audi and GridCars | 80 kW |
| Bloemfontein | Caltex Sunny Hill | GridCars | 90 kW |
| Bloemfontein | Mimosa Mall | GridCars | 60 kW |
| Bloemfontein | Windmill Casino | GridCars | 60 kW |
| Colesberg | Caltex Fresh Stop | Audi and GridCars | 150 kW |
| Colesberg | Engen Colesberg 1 Stop | GridCars | 60 kW |
| Colesberg | OK Foods, in town | GridCars | 30 kW |
| Richmond | Caltex Star Stop Karoo | Audi and GridCars | 80 kW |
| Beaufort West | Swartberg 1 Stop, Engen | GridCars | 60 kW |
| Beaufort West | Karoo Junction Mall | GridCars | 30 kW |
| Laingsburg | Engen Laingsburg 1 Stop | GridCars | 60 kW |
Sources: charger directory listings at EVPlug Free State, Western Cape and Eastern Cape, plus Audi South Africa for the Audi-branded ultra-fast sites.
An important caveat on these listings. Several of the sites above are flagged as restricted access in the directory, including Ventersburg, Bloemfontein Sunny Hill, Colesberg Caltex, Richmond, Beaufort West Swartberg and Laingsburg. The directory does not explain what restricted means, and it may refer to brand or account limitations rather than closure. Check each one in your charging app before you rely on it.
Stops we could not verify
These appear in various online route planners. We found no confirmation that any has a working public DC charger:
- Kroonstad. Only a 22 kW AC charger confirmed.
- Winburg. AC only, with a DC unit reported as planned.
- Trompsburg, Hanover, Three Sisters and Touws River. No public DC confirmed. Three Sisters has AC destination chargers at guesthouses.
- Leeu Gamka and Prince Albert Road. Nothing found.
- Matjiesfontein. 22 kW AC only, at the Lord Milner Hotel.
- Paarl. AC sites only confirmed.
If you see a guide listing Three Sisters as a fast-charging stop, treat the rest of that guide with caution.
What people who have actually driven it report
CleanTechnica documented Justus Visagie driving a Mercedes-Benz EQS 450+ from Cape Town to Johannesburg in 19 hours and 6 seconds. He charged five times, at Laingsburg, Beaufort West, Colesberg, Bloemfontein and Ventersburg, and rarely took the battery above 80 percent, because charging slows sharply past that point.
The more instructive account is less flattering. TechCentral documented a trip where all three Colesberg DC sites failed in sequence. The Astron charger returned invalid card errors, the Engen 1 Stop charger refused to initialise, and a hotel AC charger physically trapped the cable until it was freed with a screwdriver. Support eventually found a workaround.
That is the real risk on the N1. Not distance, but a single broken charger in a town with no practical alternative.
Planning your stops
These plans assume a full battery at departure and arriving at each stop with at least 15 percent remaining. Use real-world highway range, not the manufacturer's claimed figure, which is typically 20 to 25 percent optimistic at N1 speeds.
Around 300 km of real range. Ventersburg, Bloemfontein, Colesberg, Richmond, Beaufort West, Laingsburg, then a top-up before Cape Town. That is six or seven stops, several of which are single points of failure. We would not describe this as comfortable. If your car is in this bracket, consider whether the trip is better done over two days.
Around 400 km of real range. Ventersburg or Bloemfontein, then Colesberg, Beaufort West and Laingsburg. Four stops, with Richmond available as a safety net on the long Karoo leg.
Around 500 km of real range. Bloemfontein, Colesberg and Beaufort West, with Laingsburg optional. This is essentially the record run with one extra stop, and it is a straightforward drive.
TopAuto modelled a similar six-stop trip using Kroonstad, Bloemfontein, Colesberg, Beaufort West, Laingsburg and Worcester.
What the trip costs
Using 18 kWh per 100 km for highway driving, the 1,400 km trip needs roughly 252 kWh.
| How you charge | Trip cost |
|---|---|
| Public DC at R5.88 per kWh | About R1,482 |
| Public DC at R7.35 per kWh | About R1,852 |
| Public DC at R9.15 per kWh | About R2,306 |
| Petrol at 7 litres per 100 km and R30.25 | About R2,965 |
Tariff benchmarks from Rubicon. These are our calculations on the stated consumption assumption. Leaving home on a full battery removes the cost of the first charge from the public total. Work out your own figures with our EV charging cost calculator.
So the electric trip costs roughly 50 to 75 percent of the petrol equivalent, depending on which networks you use. The saving is real but smaller than people expect, because public DC charging is the most expensive way to put energy into a car.
Practical advice
- Register for more than one network before you leave. GridCars and Rubicon accounts work across each other's chargers, at your account's price.
- Check the next charger's status before leaving the current one. On the N1 this is not optional.
- Do not charge past 80 percent unless you need to. The last 20 percent can take as long as the first 60.
- Carry the GridCars support number. Both published accounts above involved support resolving a fault on the road.
- Plan arrival buffers of 20 percent, not 10. Headwinds across the Karoo are real and they cost range.
Where this data comes from
Charging site locations and power ratings in this guide come from public charger directories and operator announcements, specifically the EVPlug provincial listings for the Free State, Eastern Cape and Western Cape, and Audi South Africa's announcement of its ultra-fast charging sites. Distances come from Kweli's measured freight corridor data. Road trip accounts come from CleanTechnica and TechCentral.
Two limitations worth stating plainly. The directory listings carry no last-updated date, so a site confirmed here may have changed. And South Africa has no official register of public charging points, so no guide to this route, including this one, can claim to be complete. Always verify against a live app before departure.
Frequently asked questions
Can you drive an electric car from Johannesburg to Cape Town?
Yes. The record is 19 hours and 6 seconds, set in a Mercedes-Benz EQS 450+ with five charging stops. The route has verified DC charging roughly every 200 km, though several towns depend on a single charger.
How many charging stops does Johannesburg to Cape Town need?
Three to four stops in a car with around 500 km of real-world range, four to five with around 400 km, and six or seven with around 300 km.
What is the longest gap without charging on the N1?
Colesberg to Beaufort West is 320 km with only one verified DC site in between, at Richmond. That is the stretch that requires the most planning.
How much does it cost to drive an EV from Johannesburg to Cape Town?
Roughly R1,480 to R2,310 in public DC charging for the 1,400 km trip, depending on the networks used, against about R2,965 in petrol for a car using 7 litres per 100 km.
Which charging networks cover the N1?
GridCars operates most of the verified DC sites on the route, with several Audi-branded ultra-fast chargers at Caltex forecourts. GridCars and Rubicon accounts work across each other's chargers.